MECH WHO IS ALSO PLT WAS TOLD CERTAIN WORK COMPLETED. INSPECTED; SIGNED OFF; FLEW ACFT. MECH LATER DENIED SAYING WORK COMPLETED.

Date: 1992-02 · Aircraft: Any Unknown or Unlisted Aircraft Manufacturer · Phase: ground

Anomalies: deviation-discrepancy-procedural-far|deviation-discrepancy-procedural-published-material-policy|other-unspecified

Synopsis

MECH WHO IS ALSO PLT WAS TOLD CERTAIN WORK COMPLETED. INSPECTED; SIGNED OFF; FLEW ACFT. MECH LATER DENIED SAYING WORK COMPLETED.

Narrative

I RPTED TO DUTY TO FIND THE ACFT HAD NOT HAD THE NECESSARY WORK PERFORMED. I TALKED WITH THE MECH ON DUTY AS TO WHAT WORK HAD BEEN COMPLETED. BASED ON OUR CONVERSATION I INSPECTED THE ACFT TO DETERMINE IF SAID WORK WAS COMPLETED. BY VISUAL INSPECTION IT APPEARED THE WORK HAD BEEN PERFORMED. I COMPLETED NECESSARY ADDITIONAL WORK AND RETURNED THE ACFT TO SVC WITH MY A AND P RATING. LATER THE SAME DAY I OPERATED THE ACFT AS PIC WITH MY ATP AND THE SYS OPERATED NORMALLY IN ALL PHASES OF OP. TWO DAYS LATER I LEARNED FROM A THIRD PARTY THAT THE MECH DENIED TELLING ME THE WORK HAD BEEN PERFORMED AT WHICH TIME THE ACFT WAS BROUGHT BACK IN TO THE HANGAR AND REINSPECTED TO ASSURE ALL WORK HAD BEEN PERFORMED PROPERLY. I NOW FEAR THAT EVEN THOUGH THE SYS OPERATED OK THAT BECAUSE THE MECH NOW DENIES TELLING ME THAT CERTAIN WORK WAS PERFORMED AND I SIGNED OFF THE ACFT FOR RETURN TO SVC AND LATER FLEW SAME ACFT THAT I MAY COME UNDER INVESTIGATION. WHILE I DID NOTHING WRONG INTENTIONALLY I FEEL THAT SINCE I WAS TOLD THAT CERTAIN WORK WAS PERFORMED AND SIGNED IT OFF ONLY TO FIND OUT LATER THAT THE MECH WAS SAYING HE DID NOT REMEMBER. I FEEL TO PREVENT THIS FROM HAPPENING THAT THE COMPANY NEEDS TO COME UP WITH A BETTER TIE-IN BTWN MECHS DIRECTING MECHS TO WRITE DOWN ALL WORK THEY HAVE DONE WHETHER THEY COMPLETED IT OR NOT. SO THAT WHEN ANOTHER MECH TAKES OVER HE HAS A CLR PICTURE OF EXACTLY WHAT WAS DONE. CALLBACK CONVERSATION WITH RPTR REVEALED THE FOLLOWING INFO. RPTR STATES FAA DID COME AFTER HIM. SOMEONE IN COMPANY TURNED HIM IN. CERTIFICATES INITIALLY REVOKED BUT RPTR FOUGHT WITH AN ATTORNEY AND NOW SUSPENDED FOR 8 MONTHS. RPTR DID GET COMPANY TO DEVELOP SOME FORMS FOR WRITING UP WORK STARTED AND WHEN COMPLETED.

Source: NASA Aviation Safety Reporting System (public domain). Reports are voluntary submissions and are not verified by NASA.