A COMMUTER ACR PLT COMPLAINS ABOUT BEING SCHEDULED VERY CLOSE TO 30 HRS IN 7 DAYS.
Synopsis
A COMMUTER ACR PLT COMPLAINS ABOUT BEING SCHEDULED VERY CLOSE TO 30 HRS IN 7 DAYS.
Narrative
MY COMPANY SCHEDULED MY FO FOR 28:55 OF FLT TIME IN 6 DAYS. PART 121.71 A (3) AND (G) LIMITS FLT TIME TO 30 HRS IN 7 DAYS. AFTER 22 FLTS IN 6 DAYS; THE FO HAD FLOWN 29:13 AND WAS STILL SCHEDULED TO FLY 1 MORE 1 HR FLT. THE SCHEDULING DEPT WAS INFORMED OF THE SIT; HOWEVER; SCHEDULING SAID THE LAST REMAINING FLT COULD BE FLOWN BY THE FO BECAUSE THE EXCESS FLT TIME WAS DUE TO WX DELAYS ACCUMULATED OVER THE 6 DAY PERIOD; AND SINCE THE SCHEDULE WAS LEGAL AT THE TIME; IT WAS FIRST ASSIGNED TO THE FO. HE WAS LEGAL TO FLY THE LAST LEG. I; AS CAPT OF THE FLT; AM RESPONSIBLE FOR MY CREWS LEGALITY IN REGARDS TO FLT TIME LIMITATIONS; SO I CALLED THE COMPANY CHIEF PLT WHO INFORMED ME THAT CREW SCHEDULING WAS CORRECT AND THAT WE SHOULD FLY THE LAST FLT. I DO NOT BELIEVE IT IS THE INTENT OF 121.47 (G) TO ALLOW THE COMPANY TO SCHEDULE A PLT FOR 30 HRS OF FLT TIME AND THEN NEVER BE REQUIRED TO REVIEW THE PLT SCHEDULE AGAIN TO SEE IF THEY HAVE ACCUMULATED MORE ACTUAL FLT TIME THEN THEY WERE SCHEDULED FOR ORIGINALLY. IF THE COMPANY INTERP OF 121.471 IS CORRECT; PLT WILL BE ROUTINELY EXCEEDING 30 HRS IN 7 DAYS; BECAUSE YOU DO NOT HAVE TO ADD MUCH TIME TO EACH LEG OF 23 LEG SCHEDULES TO EXCEED 30 HRS. CALLBACK CONVERSATION WITH RPTR REVEALED THE FOLLOWING INFO: THE RPTR FLIES THE SAAB 340 FOR A LARGE COMMUTER ACR. HE WAS ADVISED THAT HE IS NOT RESPONSIBLE FOR MONITORING ANY PERSONS FLT TIME EXCEPT HIS OWN AND THAT THE SIT; AS HE PRESENTED IT IN HIS RPT; IS LEGAL UNDER THE FARS. THE RPTR FEELS THAT HIS COMPANY TREATS ITS PLTS AS A 'THIRD WORLD COUNTRY' AS FAR AS HUMAN RIGHTS ARE CONCERNED.
Source: NASA Aviation Safety Reporting System (public domain). Reports are voluntary submissions and are not verified by NASA.