BE02 FLOWN PAST ITS SCHEDULED MAINT PERIOD.

Date: 1995-10 · Aircraft: Beech 1900

Anomalies: aircraft-equipment-problem-less-severe|deviation-discrepancy-procedural-other-unknown|deviation-discrepancy-procedural-far|other-unspecified

Synopsis

BE02 FLOWN PAST ITS SCHEDULED MAINT PERIOD.

Narrative

ACFT WAS ACCEPTED FROM PREVIOUS CREW AROUND AX00 PM. THE FLTS WERE RUNNING A BIT LATE DUE TO THE BAD WX AND HAVING TO MAKE INST APCHS AT ALL ARPTS SERVED. I TOOK ACCEPTANCE OF ACFT AND TALKED TO PREVIOUS CAPT ABOUT ANY MEL'ED (DEFERRED) ITEMS OF NOTE. THERE WERE NONE. I BRIEFLY CHKED ACFT LOGS FOR VOR CURRENCY; XPONDER/STATIC TESTS. I NEGLECTED TO VERIFY THE TIME REMAINING ON THE ACFT BEFORE A REQUIRED MAINT CHK. USUALLY I AM VERY THOROUGH; BUT I WAS RECEIVING THE PLANE FROM A CAPT KNOWN TO ME TO ALSO BE THOROUGH; AND IF I HURRIED; I COULD GET MY FIRST FLT OUT ON TIME; A FACTOR THAT ALL AIRLINES CARE DEEPLY ABOUT. AFTER THE DAY'S FLTS WERE OVER; I RECORDED THE HOBBS METER TIME IN THE PROCESS OF CLOSING OUT THE ACFT LOGS FOR THE DAY. AS I WROTE THE NUMBER DOWN; IT OCCURRED TO ME THAT ON A PREVIOUS DAY WHEN I HAD FLOWN THIS PLANE; AN INSPECTION WAS REQUIRED AT 2 HRS PRIOR TO TODAY'S READING. I LOOKED AT THE RELEVANT LOG PAGE AND FOUND I WAS CORRECT; AND IT HADN'T BEEN SIGNED OFF YET. THE RESULT: I FLEW THE PLANE FOR ABOUT 5 HRS; AND THE LAST 2 HRS HAD BEEN BEYOND A REQUIRED SIGN-OFF. I IMMEDIATELY NOTIFIED THE COMPANY OF THE SIT; AND THE ACFT WAS TAKEN OTS. THE NEXT DAY; A FERRY PERMIT WAS OBTAINED; AND THE ACFT FLOWN TO A MAINT BASE FOR A SIGN-OFF. IT TURNS OUT THE INSPECTION HAD BEEN ALL-BUT-COMPLETED A WK PRIOR; BUT THE LAST ITEM AND OVERALL SIGN-OFF HAD BEEN PUT OFF UNTIL THE ACFT WAS TO BE AS CLOSE AS POSSIBLE TO THE LEGAL LIMIT. IN THIS WAY; ALL THE INSPECTIONS ARE RECORDED AS HAVING TAKEN PLACE AT A LATER TIME; AT THE LAST POSSIBLE MOMENT; AND THE FULL-BTWN-INSPECTION HRS ARE ALLOWED. THE MAINT DEPT; HOWEVER; FORGOT ABOUT THE ACFT; AND DID NOT STOP US FOR THE SIGNATURE WHEN WE PASSED THROUGH OUR MAINT BASE EITHER TIME THAT DAY. THE FLT OPS MGMNT CTR DID NOT SEEM TO KNOW ABOUT IT EARLIER; AS THEY DID NOT DISCUSS IT WITH ME WHEN I CHKED IN AT THE BEGINNING OF THE DAY. HOW TO PREVENT RECURRENCE: I NEED TO CHK THE LOG EVERY TIME AND ACCEPT A SLIGHT FLT DELAY; MAINT NEEDS TO KEEP BETTER TRACK OF WHEN SIGN-OFFS ARE DUE; AND PERHAPS THE FAA SHOULD LOOK INTO THE PRACTICE OF DOING 95 PERCENT OF AN INSPECTION BEFORE IT'S DUE; AND DATING THE CHKS WHEN THE LAST 5 PERCENT IS DONE. CALLBACK CONVERSATION WITH RPTR REVEALED THE FOLLOWING INFO: RPTR HAD NOTHING TO ADD TO THE RPT. SO FAR AS HE KNEW; THIS PRACTICE OF 'EARLY' INSPECTIONS IS THE NORM WITH THIS AIRLINE. RPTR IS NO LONGER WITH THE ACR; HAVING LEFT OF HIS OWN VOLITION IN LATE OCT; LAST YR. HE SAID HE WAS 'AWAY FROM HOME TOO MUCH IN THIS TYPE OF 135 OP.'

Source: NASA Aviation Safety Reporting System (public domain). Reports are voluntary submissions and are not verified by NASA.