SHUTDOWN OF MIL OMEGA VLF STATION AND REASSIGNMENT OF FREQ TO HAWAII CREATES NAV PROB WITH OMEGA VLF EQUIP.
Synopsis
SHUTDOWN OF MIL OMEGA VLF STATION AND REASSIGNMENT OF FREQ TO HAWAII CREATES NAV PROB WITH OMEGA VLF EQUIP.
Narrative
ACFT IS EQUIPPED WITH DUAL GLOBAL WOLFSBURG GNS-X VLF NAV SYS. WE HAVE BEEN EXPERIENCING NUMEROUS SENSOR MISCOMPARES SINCE MAY/XX/96 TO THE PRESENT. MAINT UNABLE TO FIND ANY DISCREPANCIES WITH EITHER NAV UNIT. NO NOTAMS OR CTR ADVISORIES WERE PUBLISHED CONCERNING STATION SHUTDOWNS. WE COME TO FIND OUT; ON OUR OWN; THAT THE MIL HAS SHUT DOWN ANNAPOLIS AND REASSIGNED ITS FREQ TO HAWAII. NUMEROUS OTHER OPERATORS ARE COMPLAINING OF NAV ANOMALIES ALSO. THERE NEEDS TO BE PROPER NOTIFICATION THROUGH FSS OR CTR CONCERNING THESE SHUTDOWNS. CALLBACK CONVERSATION WITH RPTR REVEALED THE FOLLOWING INFO: RPTR STATES THAT HIS COMPANY HAS TALKED WITH JUST ABOUT EVERYONE THEY CAN TO DETERMINE THE PROB. NAVAL LIAISON IN WASHINGTON; DC; WAS AMAZED TO HEAR THAT THE STATION HAD BEEN SHUT DOWN WITH NO NOTIFICATION TO ANYONE. THE LCL FSDO WAS NOT AWARE OF THE SHUTDOWN. THE MANUFACTURER WAS NOT AWARE OF THE SHUTDOWN. RPTR FINALLY LEARNED ABOUT IT FROM AN AVIONICS SVC CTR. MIL PERSONNEL WHO HAVE BEEN CONTACTED DO NOT SEE A PROB SINCE IT IS A MIL INSTALLATION AND THEY CAN SHUT IT DOWN ANY TIME THEY WANT TO WITHOUT NOTIFYING ANYONE. RPTR SAYS THAT ONE FLT GOING TO NEW YORK HAD TO GO INSHORE BECAUSE THIS SHUTDOWN AND REASSIGNMENT OF THE FREQ TOTALLY DISRUPTED THE GEOMETRY OF THE SIGNALS. HE FEELS IT IS A DEFINITE HAZARD TO SAFETY OF FLT AND THAT INFO REGARDING THE CHANGE SHOULD BE DISSEMINATED AS RAPIDLY AS POSSIBLE.
Source: NASA Aviation Safety Reporting System (public domain). Reports are voluntary submissions and are not verified by NASA.