FLC OF LEAR 60 DEPARTS FOR OVERWATER FLT WITHOUT RAFT ABOARD.
Synopsis
FLC OF LEAR 60 DEPARTS FOR OVERWATER FLT WITHOUT RAFT ABOARD.
Narrative
WE RECEIVED NOTICE OF A POP-UP TRIP ABOUT 2 1/2 HRS BEFORE SCHEDULED DEP FROM LGA. WE HAD TO REPOS ACFT FROM TEB TO LGA. THE ULTIMATE DESTINATION WAS BERMUDA. WE WERE TOLD NOT TO BE LATE BECAUSE OUR COMPANY HAD BEEN LATE TWICE BEFORE AND THE CUSTOMER HAD SAID IF WE'RE LATE 1 MORE TIME HE WOULD CANCEL OUR CONTRACT. OUR COMPANY DOES NOT KEEP LIFE RAFTS ON ANY OF OUR LEAR 60'S. THEY RELY ON AN INTERNAL SYS OF SCHEDULERS AND CUSTOMER SVC PERSONNEL TO MAKE A RAFT AVAILABLE FOR EACH FLT THAT NEEDS ONE. UPON ARRIVING AT TEB; MAINT PERSONNEL WERE FINISHING THE REPLACEMENT OF A FRAYED DOOR CABLE. THIS DELAYED US BY 40 MINS. SOON AFTER ENG START OUR #1 ATTITUDE AND HDG REF SYS WOULD NOT COME ON LINE. AFTER WORKING WITH IT FOR 15 MINS IT FINALLY STABILIZED ITSELF AND WE LEFT FOR LGA. THIS FLT TOOK 30 MINS DUE TO ATC DELAYS. WHEN WE FINALLY ARRIVED AT LGA; IT WAS 10 MINS UNTIL OUR SCHEDULED DEP AND 1 OF 6 PAX WAS THERE. WE HURRIEDLY FUELED AND PREPARED FOR THE LEG TO BERMUDA. WE TOOK OFF 40 MINS AFTER OUR SCHEDULED DEP TIME. SEVERAL HRS AFTER ARRIVING AT BERMUDA WE REALIZED WE HAD FORGOTTEN THE LIFE RAFT. WE HAD IT FLOWN TO US VIA COUNTER-TO-COUNTER ON AN ACR AND RETURNED TO THE STATES WITH IT. OUR INTERNAL SYS OF CHKS FAILED AS WELL AS THE MEMORIES OF BOTH PLTS. OUR FLT CTLR FAILED TO ASK US IF WE HAD THE RAFT WHEN WE CALLED FOR OUR RELEASE. OUR SCHEDULER FAILED TO FAX THE RAFT TRACKING FORM TO US AS WELL. MY SUGGESTION (WHICH HAS BEEN MY POS FOR ABOUT 10 MONTHS) IS TO PLACE LIFE RAFTS ON ALL OUR LEAR 60'S. THIS IS NOW BEING SERIOUSLY CONSIDERED AND WILL PROBABLY OCCUR.
Source: NASA Aviation Safety Reporting System (public domain). Reports are voluntary submissions and are not verified by NASA.