ZTL CTLR CONCERNED WITH NOT BEING ABLE TO CHANGE THE INST APCH RWY AT MGM ARPT WHEN APCH CTL SVCS ARE DELEGATED TO ZTL FROM MGM.
Synopsis
ZTL CTLR CONCERNED WITH NOT BEING ABLE TO CHANGE THE INST APCH RWY AT MGM ARPT WHEN APCH CTL SVCS ARE DELEGATED TO ZTL FROM MGM.
Narrative
MGM APCH CLOSES; PREVAILING WINDS DICTATE ILS TO RWY 28; FRONT MOVES THROUGH THE NIGHT; CTR ASSUMES AIRSPACE; 2 INBOUNDS LATE INTO NIGHT; ILS TO DOWNWIND RWY SET UP; WINDS FAVOR RWY 10. UNABLE TO CHANGE ILS UNTIL APCH OPENS 1 HR LATER. 1 ACFT (X) LANDS VIA NDB APCH; OTHER MISSES APCH; FORCED TO LAND DOWNWIND. AREA MANAGER BELIEVES THAT ILS CAN BE CHANGED THROUGH FSS. FSS ADVISES THAT THEY CANNOT CHANGE EQUIP. SINCE THE CTR ASSUMES NUMEROUS APCH CTL AIRSPACE DURING LATE NIGHT OPS; THIS PROVIDES THE USER WITH A FALSE SENSE OF SECURITY IN THE SYS. CALLBACK CONVERSATION WITH RPTR ON ACN 435607 REVEALED THE FOLLOWING INFO: RPTR STATES THAT ON THE LATE NIGHT SHIFT; HE PROVIDES AIR TFC SVC FOR A NUMBER OF CLOSED APCH CTL FACILITIES; SUCH AS COLUMBUS; GA; MONTGOMERY; AL; CAINS TRACON (DEPT OF DEFENSE); AND MERIDIAN TRACON. IF WIND CONDITIONS CHANGE; THE RPTR ADVISED THERE IS NO PHYSICAL WAY TO HAVE THE INST APCH EQUIP CHANGED. NEITHER DOES THE 2 FSS'S; MACON AND ANNISTON. THE RPTR STATES THAT THE ARTCC MUST WAIT UNTIL THE TRACON/ATCT OPENS; EVALUATES WX CONDITIONS; AND ALIGNS THE INST APCH ACCORDINGLY. THE RPTR IS CONCERNED WITH THIS PROCESS; BELIEVING THAT AIRSPACE DIVERSITY IS SIGNIFICANTLY REDUCED AND INEFFICIENT. THIS LACK OF FLEXIBILITY IS PERCEIVED TO PLACE A NEGATIVE DECISION MAKING PROCESS ON THE PLT; REQUIRING THE PLT MAKE AN APCH TO A RWY THAT HE MAY NOT BE ABLE TO LAND UPON. THE CTLR WANTS A PROCESS BE MADE AVAILABLE THAT WILL PERMIT CHANGING INST APCH EQUIP WHEN THE TRACON'S/ATCT'S ARE CLOSED AND RETURNED TO THE ARTCC TO PROVIDE APCH CTL SVC.
Source: NASA Aviation Safety Reporting System (public domain). Reports are voluntary submissions and are not verified by NASA.