A LEAD TECHNICIAN ALLEGES COERCION BY MGMNT TO SIGN OFF WORK NOT PERFORMED BY THE RPTR ON AN MD83 FUEL TANK AND TANK COMPONENTS.

Date: 2001-05 · Aircraft: MD-83 · Phase: ground

Anomalies: aircraft-equipment-problem-critical|deviation-discrepancy-procedural-far|deviation-discrepancy-procedural-published-material-policy|deviation-discrepancy-procedural-maintenance

Synopsis

A LEAD TECHNICIAN ALLEGES COERCION BY MGMNT TO SIGN OFF WORK NOT PERFORMED BY THE RPTR ON AN MD83 FUEL TANK AND TANK COMPONENTS.

Narrative

WAS FORCED TO SIGN OFF WORK PERFORMED TO THE FORWARD AUX TANK THAT WAS INCORRECT AND WORK THAT I DID NOT DO. WAS WORKING FUEL LEAK OF THE FORWARD AUX TANK. TANK BAG WAS REMOVED ALONG WITH THE BAG COMPONENTS. BAG WAS INSTALLED BACK IN ACFT. COMPONENTS WERE INSTALLED AND TANK CLOSED. TANK WOULD NOT HOLD PRESSURE WHEN TESTED. FOUND APPROX 5 GALLONS OF FUEL IN CAVITY. SUPVR MADE ME SIGN OFF FORWARD AUX TANK COMPONENTS THAT I DID NOT INSTALL; AND SUPVR FORCED ME TO SIGN OFF INSTALLING FORWARD AUX TANK COMPONENTS PER M9-57-01 WHICH DOES NOT COVER FUEL TANK COMPONENTS. CALLBACK CONVERSATION WITH RPTR REVEALED THE FOLLOWING INFO: THE RPTR STATED THE SUPVR FORCED THE SIGNOFF OF WORK THAT I DID NOT ACCOMPLISH AND WORK THAT MY CREW DID NOT ACCOMPLISH. THE RPTR SAID THE SUPVR IGNORED THE LEAKING TANK AND REQUIRED A SIGNOFF OF THE PAPERWORK. THE RPTR STATED ALL OF THE FACTS ON THE JOB AND WORK ACCOMPLISHED WERE DOCUMENTED AND RPTED TO THE LCL FLT SAFETY OFFICE. THE RPTR SAID THE SUPVR HAS SINCE THE SIGNOFF INCIDENT CONTINUED TO HARASS AND ANNOY HIM. THE RPTR SAID THE FAA WILL NOT ADVISE OF ANY ACTION BEING TAKEN.

Source: NASA Aviation Safety Reporting System (public domain). Reports are voluntary submissions and are not verified by NASA.