MLG CREW DID NOT COMPLY WITH ALL SPECIAL PROCS CALLED OUT IN THE MEL FOR DISPATCH WITH AN INOP APU.
Synopsis
MLG CREW DID NOT COMPLY WITH ALL SPECIAL PROCS CALLED OUT IN THE MEL FOR DISPATCH WITH AN INOP APU.
Narrative
APPROX 5 MINS PRIOR TO DEP; THE ACFT MECH RETURNED THE LOGBOOK AND TOLD ME; 'I'VE PLACARDED THE APU AND EVERYTHING IS READY TO GO.' I HAD ALREADY REVIEWED THE LOGBOOK; AND KNEW THERE WAS 1 OPEN WRITE-UP (APU). EVERYTHING ELSE WAS SIGNED OFF PROPERLY. I QUICKLY LOOKED AT THE LOGBOOK; SAW THAT THE OPEN WRITE-UP HAD A BALANCING ENTRY; HAD BEEN DEFERRED; AND HAD BEEN SIGNED BY THE MECH WITH THE MEL NUMBER AND DEFERRAL NUMBER; AND THEN INITIALED THE LOGBOOK INDICATING MY REVIEW. DURING THE FLT; I REALIZED THAT I HAD NOT REVIEWED THE MEL MYSELF EVEN THOUGH IT WAS FOR SOMETHING AS MINOR AS AN INOP APU. BY NOT REVIEWING THE MEL; I HAD OVERLOOKED THE REQUIREMENT FOR ME TO DO A GENERATOR XOVER CHK TO SEE IF BOTH GENERATORS WOULD CARRY THE TOTAL LOAD; INDEPENDENT OF THE OTHER. ALSO FOUND THAT THE MECH HAD NOT MADE THE REQUIRED ENTRY STATING THAT HE HAD CHKED EACH GENERATOR'S HISTORY AND CSD OIL LEVEL PRIOR TO THE FLT. I HAD TOTALLY MISSED BOTH OF THESE ITEMS. THE PUSH BY EVERYONE FOR AN ON-TIME DEP MAKES THE LAST FEW MINS VERY HECTIC AT TIMES. A CONTRIBUTING FACTOR WAS THE FACT THAT I HAD FLOWN ONLY ONCE IN THE PAST 35 DAYS. ALSO; THE ACFT WAS ONLY ON THE GND FOR APPROX 45 MINS. THEN THE MECH SHOWED LATE. SINCE SEP/11/01; A GOOD PORTION OF OUR TIME AND ATTN IS TAKEN BY NEW AND CHANGING SECURITY REQUIREMENTS. IT GOES BACK TO THE FACT THAT I; THE CAPT; HAVE TO SLOW THE PROCESS DOWN AT TIMES TO MAKE SURE EVERYTHING IS DONE CORRECTLY.
Source: NASA Aviation Safety Reporting System (public domain). Reports are voluntary submissions and are not verified by NASA.