AN ARTCC CTLR COMPLAINS THAT ACR'S ARE NOT MEETING A XING RESTR AT SWEDE INTXN BECAUSE THEY APPEAR TO USE LESS THAN A STANDARD RATE OF DSCNT AND DO NOT PLAN FOR THE EXPECTED XING ALT.

Date: 2004-11 · Aircraft: Commercial Fixed Wing · Phase: cruise

Anomalies: deviation-altitude-crossing-restriction-not-met|deviation-discrepancy-procedural-clearance|deviation-discrepancy-procedural-published-material-policy

Synopsis

AN ARTCC CTLR COMPLAINS THAT ACR'S ARE NOT MEETING A XING RESTR AT SWEDE INTXN BECAUSE THEY APPEAR TO USE LESS THAN A STANDARD RATE OF DSCNT AND DO NOT PLAN FOR THE EXPECTED XING ALT.

Narrative

NUMEROUS ACR'S ARE DSNDING AT NONSTANDARD RATES OF DSCNT AND ARE UNABLE TO MEET XING RESTR. IN PARTICULAR; THE SWEDE 1 ARR HAS A RESTR OF 'EXPECT SWEDE AT OR BELOW FL230.' YET; NUMEROUS TIMES ACR TFC IS NOT ABLE TO COMPLY WITH THAT RESTR BECAUSE THEIR PREVIOUS RATES OF DSCNT WERE NOT SUFFICIENT. A MAJORITY OF THE TIME; THE ACFT ARE DSNDING AT 750-1000 FPM; WHEN THE NORMAL DSCNT RATE IS 1250-1750 FPM. THIS CHANGE IN OP IS CAUSING SIGNIFICANT ADDITIONAL WORKLOAD BECAUSE IF AN ACFT CANNOT MEET A RESTR; THERE IS COORD WHICH NEEDS TO BE DONE IN A TIMELY MANNER. ON AT LEAST 2 OCCASIONS; I HAVE HAD TO TURN ACFT 45 DEGS OR MORE BECAUSE OF THEIR LESS THAN NORMAL RATES OF DSCNT. CALLBACK CONVERSATION WITH RPTR REVEALED THE FOLLOWING INFO: THE INCIDENTS OCCUR SEVERAL TIMES PER DAY. THEY MOSTLY INVOLVE ACFT WITH FMS NAV SYS. ONE ACR CAUSES THE PROB MORE THAN OTHERS. EVEN THOUGH THE STAR (SWEDE 1 ARR) SHOWS AN EXPECTED XING ALT; IT IS NOT ASSIGNED UNTIL ENTERING THE RPTR'S SECTOR. AFTER THE HDOF INTO THAT SECTOR; OFF-COURSE VECTORS ARE NEEDED TO MAKE IT POSSIBLE TO MEET THE XING.

Source: NASA Aviation Safety Reporting System (public domain). Reports are voluntary submissions and are not verified by NASA.