A B737-300 WAS DISPATCHED WITH THE #2 ENG THRUST REVERSER INBOARD BLOCKER DOORS NOT CONNECTED AFTER THRUST REVERSER SLEEVE WORK.
Synopsis
A B737-300 WAS DISPATCHED WITH THE #2 ENG THRUST REVERSER INBOARD BLOCKER DOORS NOT CONNECTED AFTER THRUST REVERSER SLEEVE WORK.
Narrative
AN ACFT WAS AT ZZZ MAINT IN BAY WITH THE #1 ENG INBOARD; AND #2 ENG INBOARD AND OUTBOARD THRUST REVERSERS WRITTEN UP FOR LOOSE/MISSING FASTENERS. WE REMOVED ALL 3 THRUST REVERSER SLEEVES; REPLACED THE FASTENERS; REINSTALLED AND OPS CHKED THE THRUST REVERSERS. MECHS FOUND THE BLOCKER DOORS DISCONNECTED ON THE #2 ENG INBOARD THRUST REVERSER. THE DECISION TO ACCOMPLISH THIS REPAIR WAS NOT MADE UNTIL LATE IN THE SHIFT. THERE WERE SEVERAL MECHS INVOLVED IN REMOVING AND REINSTALLING THE SLEEVE. WE WERE UNDER PRESSURE TO MAKE THE GATE. IN OUR HASTE TO ACCOMPLISH THIS TASK; SOMEHOW THE BLOCKER DOORS WERE NOT CONNECTED. DURING THE OPS CHK; THE THRUST REVERSER TRANSLATED NORMALLY BUT EVIDENTLY NO ONE LOOKED UP THE TAILPIPE ON THE INBOARD SIDE OF THE #2 ENG. THE MECH WHO SIGNED THE PAPERWORK DID SO TO EXPEDITE THE PROCESS AND DID NONE OF THE INSTALLATION ON THE #2 ENG. THIS IS AN EXAMPLE OF MAJOR TEAM WORK WITH A LACK OF COM. WE COULD HAVE AVOIDED THIS SIT IF THE OPS CHK HAD BEEN PERFORMED WITH SOMEONE BEHIND THE #2 ENG OR IF THERE HAD BEEN BETTER COM BTWN THE MECH WHO DISCONNECTED THE BLOCKER DOORS AND THE MECHS WHO INSTALLED THE INBOARD THRUST REVERSER SLEEVE.
More incidents for this aircraft family →
Source: NASA Aviation Safety Reporting System (public domain). Reports are voluntary submissions and are not verified by NASA.