MD 80 CAPTAIN REPORTS PUSH BACK CREW IS NOT STAYING WITHIN RAMP BOUNDARIES DURING PUSH BACK AND IS GETTING TOO CLOSE TO A FENCE.

Date: 2007-04 · Aircraft: MD-80 Series (DC-9-80) Undifferentiated or Other Model · Phase: taxi

Anomalies: conflict-ground-conflict|less-severe|deviation-discrepancy-procedural-published-material-policy

Synopsis

MD 80 CAPTAIN REPORTS PUSH BACK CREW IS NOT STAYING WITHIN RAMP BOUNDARIES DURING PUSH BACK AND IS GETTING TOO CLOSE TO A FENCE.

Narrative

ON PUSHBACK FROM THE GATE AT SEATTLE; OUR GND CREW PUSHED THE ACFT UNCOMFORTABLY CLOSE TO THE CHAIN LINK FENCE BEHIND AND N OF GATES -- NOT ONCE; BUT TWICE. THE FIRST INCIDENT TOOK PLACE WHEN I NOTICED THE NOSEWHEEL OF THE JET WAS BTWN THE TXWY CTRLINE AND THE DOUBLE YELLOW LINES; DELINEATING THE EDGE OF THE RAMP AREA. I IMMEDIATELY CALLED THIS TO THE ATTN OF THE GND CREW AND THEY PROMPTLY CORRECTED THE ACFT'S POS. THE SECOND EVENT TOOK PLACE AS I WAS IN THE PROCESS OF STARTING THE ENGS. NOT LONG AFTER ENGAGING THE START SWITCH FOR THE R ENG; I LOOKED OUTSIDE AND AGAIN NOTICED THE NOSEWHEEL OF THE ACFT WAS ALMOST ALIGNED WITH THE DOUBLE YELLOW LINES DELINEATING THE EDGE OF THE RAMP AREA; RATHER THAN THE CTRLINE OF THE TXWY. I IMMEDIATELY RELEASED THE START SWITCH AND ABORTED THE START AS I CALLED THIS DEV FROM THE CTRLINE TO THE GND CREW'S ATTN. THIS TIME NO EFFORT WAS MADE TO REPOS THE ACFT AND THEY INSTRUCTED ME TO SET BRAKES IN ORDER FOR THE TOW BAR TO BE DISCONNECTED. AFTER ENG START; I MADE THE DECISION TO RETURN TO THE GATE IN ORDER FOR MAINT TO INSPECT THE ACFT JUST TO BE CERTAIN THAT THERE HAD BEEN NO CONTACT BTWN THE JET AND THE CHAIN LINK FENCE. AFTER SPEAKING WITH THE GND CREW'S MGR; I WAS TOLD THAT THE GND CREW ESTIMATED OUR JET 'WAS WITHIN 6 FT OF THE FENCE ON PUSHBACK.' IT'S IMPORTANT TO CAREFULLY MONITOR THE GND CREW ON PUSHBACK. AT NIGHT; ALL FLT DECK LIGHTS SHOULD BE SELECTED TO A DARKENED POS TO MAXIMIZE VISIBILITY OUTSIDE THE AIRPLANE. ALSO; I WOULD RECOMMEND THAT NO DUTIES BESIDES MONITORING THE PUSHBACK TAKE PLACE OFF THESE 2 GATES UNTIL THE GND CREW HAS POSITIONED THE ACFT IN A POS; SO THAT CONTACT WITH THE FENCE WOULD NOT BE POSSIBLE. PERFORMING NO DUTIES ON PUSHBACK OTHER THAN MONITORING PUSHBACK WOULD ALSO ENTAIL DELAYING ENG START UNTIL WELL IN THE CLR AND AWAY FROM THE FENCE AREA.

Source: NASA Aviation Safety Reporting System (public domain). Reports are voluntary submissions and are not verified by NASA.