PLT HAS NUMEROUS SAFETY CONCERNS WITH COMPANY RAMP OPERATIONS.
Synopsis
PLT HAS NUMEROUS SAFETY CONCERNS WITH COMPANY RAMP OPERATIONS.
Narrative
AFTER STARTING THE R ENG AND WHILE WAITING FOR THE WT AND BAL PAPERWORK; THE START MARSHALLER CAME UP ALONG SIDE THE ACFT TO SEE WHAT WAS THE DELAY. I TRIED TO TELL HIM THAT WE WERE WAITING FOR THE PAPERWORK. HE THEN PROCEEDED TO WALK AWAY FROM THE ACFT AND INTO THE OPS AREA. I SHUT DOWN THE R ENGINE. A COUNTER AGENT CAME OUT WITH THE PAPERWORK AND THE STARTER LOOKED CONFUSED WHY I SHUT DOWN THE ENG. THE PAPERWORK WAS REVIEWED AND WE SIGNALED TO RESTART THE R ENGINE. DSM HAS BEEN A FAIRLY LAX STATION RECENTLY. WHILE STARTING THE R ENG AT GATE I OBSERVED THE CSA BRING THE WT AND BAL TO THE END OF THE JETBRIDGE. A SECOND RAMP PERSON; NOT WEARING A VEST; CAME UP AND GOT THE PAPERWORK AND WALKED TO THE SIDE OF THE ACFT. THE ENG START WAS JUST BEGINNING WHEN HE FIRST KNOCKED ON THE SIDE OF THE ACFT. I IGNORED HIM AND CONTINUED TO MONITOR THE ENG START. HE KNOCKED A SECOND TIME. AGAIN IGNORED. HE KNOCKED A THIRD TIME JUST AS THE START SEQUENCE WAS ENDING. AFTER FINISHING MY FLOW; I THEN LOOKED OUT THE L WINDOW TO SEE HIM WAVING THE PAPERWORK TO GET MY ATTN. UPON ARR AT DEST THE JETWAY WAS BROUGHT UP TO THE ACFT. AS IS COMMON HERE THE CANOPY IS VERY TIGHT TO THE ACFT. THIS TIME HOWEVER THE CANOPY WAS RUBBING ONTO THE WINDOW. THIS HAS BEEN DISCUSSED WITH THE STATION AND PICTURES SENT TO THE FLT DEPT ON MANY PAST OCCASIONS. NEXT LEG; AFTER PARKING AT GATE; THE ENGS WERE SHUT DOWN AND I OBSERVED THE RAMP PERSON WALK BTWN THE JETWAY AND THE PROP. HE THEN PROCEEDED TO CUT THROUGH THE PROP RESTR AREA INSIDE THE WINGTIP. I OBSERVED THESE CONDITIONS. COMMUNICATED THE CONDITIONS TO PEOPLE IF AVAILABLE. THE RAMP IN THE HUBS AND THE OUTSTATIONS CONTINUE TO HAVE ISSUES WITH SOP.
Source: NASA Aviation Safety Reporting System (public domain). Reports are voluntary submissions and are not verified by NASA.