WDB DIVERTED TO ANOTHER ARPT WHEN AN ENGINE PROBLEM WAS DISCOVERED ON TKOF.
Synopsis
WDB DIVERTED TO ANOTHER ARPT WHEN AN ENGINE PROBLEM WAS DISCOVERED ON TKOF.
Narrative
WE WERE REQUESTED TO USE MAX PWR FOR OUR TKOF FROM EWR IN ORDER TO SATISFY OUR COMPANY'S SCHEDULED CHKS ON ENG PERFORMANCE. WE MADE A ROLLING TKOF WITH AUTO THROTTLES ENGAGED. FOLLOWING UP THE THROTTLES WE SAW ENG #2 WAS 2-3% SHY OF THE DESIRED N1. MANUALLY ADVANCING THE #2 THROTTLE TO ITS STOP DID NOT INCREASE THE N1. BY THIS TIME THE ACFT HAD ACCELERATED TO A SPD (APPROX V1) WHEREIN ABORTING THE TKOF WOULD HAVE SUBJECTED THE PAX TO A POSSIBLE GND EVAC AND INJURY AND THE ACFT TO PROBABLE DAMAGE. SINCE THE ACFT'S PERFORMANCE WAS NOT NOTICEABLY AFFECTED AND NO EMER THEN EXISTED; THE DECISION WAS MADE TO CONTINUE THE TKOF. THIS WAS DONE UNEVENTFULLY. RATHER THAN CONTINUE THE FLT TO ITS OVERWATER DEST WITH 1 ENG UNABLE TO DEVELOP MAX PWR; THE FLT DIVERTED TO JFK FOR CORRECTIVE MAINT. LNDG WT WAS NOT EXCEEDED AND THE ENTIRE FLT WAS CONDUCTED W/O INCIDENT. CALLBACK CONVERSATION WITH RPTR REVEALED THE FOLLOWING: THE PWR CHK ON TKOF WAS NOT MADE BECAUSE THIS WAS AN OVERWATER FLT. PWR CHKS ARE MADE ON ALL ACFT PERIODICALLY TO ENSURE THE ENGS ARE CAPABLE OF FULL PWR BECAUSE MOST TKOFS ARE MADE AT REDUCED PWR AND A PWR LIMITING ANOMALY MIGHT NOT BE DISCOVERED UNTIL FULL PWR WAS NEEDED IN AN EMER SITUATION. WHICH TKOFS WILL USE FULL PWR IS DETERMINED BY THE ACR AND INDICATED ON THE DISPATCH RELEASE.
Source: NASA Aviation Safety Reporting System (public domain). Reports are voluntary submissions and are not verified by NASA.