Technician reported conflicting Revised Engineering Orders caused confusion between Technicians and Engineering. The Aircraft was removed from service for additional maintenance.
Synopsis
Technician reported conflicting Revised Engineering Orders caused confusion between Technicians and Engineering. The Aircraft was removed from service for additional maintenance.
Narrative
While Aircraft X was in ZZZ SVL on Date it was noted that during the repair of LH Aileron Rub block disbonding for PWI WXXXXXX & WXXXXXY that the wrong REOXXXX-XX-XX-XXX (aileron P/N 60XXXXXXX-X was used to create the Planning Watch Item for re-inspection and permanent repair. Aircraft X) has LH Aileron installed P/N CCXXX-XXXXXX-XXX/XX which should have had REOXXX-XX-XX-XXY complied with for the re-inspection and permanent repair. Per PMI; PWI were initiated in ZZZ1 on Date1 deferred by Name.Complying with a permanent repair for PWI WXXXXXX and WXXXXXY to LH Aileron Rub Block disbonding. Noted REOXXXX-XX-XX-XXX was not for the P/N Aileron currently installed on this aircraft. Has LH Aileron P/N CCXXX-XXXXX-XXX/XY installed which should have REOXXX-XX-XX-XXY for inspection and permanent repair for creation of PWI.Could have been caused by lack of knowledge that there is two different REO's for dis-bonding rub blocks for different P/N Aileron's which have different re-inspection and permanent repair intervals used on the CRJ200/700/900 fleet.
More incidents for this aircraft family →
Source: NASA Aviation Safety Reporting System (public domain). Reports are voluntary submissions and are not verified by NASA.