A230 FLT CREW EXECUTE GAR DUE TO AN UNSTABLE APCH CAUSED BY L30 APCH SEQUENCE AND RWY CHANGE AND POTENTIAL CONFLICT WITH ANOTHER ACR ON APCH TO ANOTHER RWY.

Date: 2003-08 · Aircraft: A320

Anomalies: conflict-airborne-conflict|inflight-event-encounter-weather-turbulence|inflight-event-encounter-unstabilized-approach

Synopsis

A230 FLT CREW EXECUTE GAR DUE TO AN UNSTABLE APCH CAUSED BY L30 APCH SEQUENCE AND RWY CHANGE AND POTENTIAL CONFLICT WITH ANOTHER ACR ON APCH TO ANOTHER RWY.

Narrative

UPON ARR TO LAS VIA THE KSINO STAR; WE WERE PLANNING RWY 25L. APCHING LUXOR; WE WERE CHANGED TO RWY 19L; WHICH HAS NO APCH GUIDANCE. WE LOADED THE RWY IN THE FMGC AND PLANNED A VISUAL APCH. SINCE NEITHER ONE OF US HAD DONE THIS ARR; WE PLANNED AN ENTRANCE OVER THE RWY WITH A R DOWNWIND. WHAT WE GOT WAS A SLAM-DUNK L BASE. THEY HAD KEPT OUR SPD UP AND WE HAD TO CROSS OVER A MOUNTAIN RANGE AT 5100 FT (MVA IS 5000 FT; WE WERE AT 210 KTS). TRYING TO SLOW TO CONFIGURE THE AIRPLANE AND GET THE GEAR DOWN FOR OUR SLAM-DUNK (GEAR DOWN; FLAPS 3 DEGS AND SPD 170 KTS); WE REALIZED THAT WE WERE UNABLE TO BE STABLE AND THE APCH WAS ABANDONED. NOW WE WERE BEING VECTORED TO THE R DOWNWIND; HOWEVER; NOW WE HAD CONFLICTING TFC OVERHEAD (ACR LNDG RWY 19L). ATC DID A GOOD JOB VECTORING US AROUND HIM. WE WERE THEN CLRED FOR THE VISUAL APCH TO RWY 19L. THE PROB I SEE HERE IS NOT THE ARR TO RWY 19L (WHICH NOW I KNOW THAT I HAVE TO BE CONFIGURED AND SLOWED OVER THE MOUNTAIN TO GET DOWN); BUT THE USE OF RWY 7 FOR DEPS WHILE THE PRIMARY RWY IS 25. DURING THE NUMEROUS ARRS OVER THE 3 DAYS THAT FLEW INTO LAS; THE OP OF DEPARTING RWY 7 WHILE THE PRIMARY DEPS WERE GOING OFF RWY 25 SEEMED DANGEROUS AND CAUSED DELAYS FOR DEPARTING AND ARRIVING TFC. I ONLY NOTICED ONE CARRIER USING RWY 7 A LOT. I DID A PULL UP OF OUR WTS EACH TIME I SAW A DEP OFF RWY 7 AND WE WERE UNABLE TO DEPART RWY 7; MAINLY BECAUSE OF THE TAILWIND FACTOR THAT WAS TAKING PLACE. I KNOW WE HAVE A 10 KT LIMIT -- I AM REAL CURIOUS WHAT THEIR LIMIT IS? I DID CALL THE TWR AND INQUIRED ABOUT THE PROC. THEY WERE REAL HELPFUL AND EXPLAINED THAT IT HAPPENS A LOT AND THEY ARE NOT HAPPY ABOUT IT; BUT IF A CARRIER ASKS FOR THE RWY; THEY TRY TO ACCOMMODATE THEM. HOWEVER; IT CAUSES DELAYS FOR OTHER DEPS AND ARRS.

More incidents for this aircraft family →