A CRJ700 ON APCH AT 8000 FT DECLARED AN EMER DUE TO SLAT EXTENSION FAILURE; AND RECEIVED TRAILING EDGE FLAPS WITH SLATS FAIL MESSAGE. AOM PROCS PERFORMED AND TRAILING EDGE FLAPS RECOVERED. LANDED UNEVENTFULLY.

Date: 2005-12 · Aircraft: Regional Jet 700 ER/LR (CRJ700) · Phase: approach

Anomalies: aircraft-equipment-problem-critical|deviation-discrepancy-procedural-far|deviation-discrepancy-procedural-maintenance|deviation-discrepancy-procedural-published-material-policy

Synopsis

A CRJ700 ON APCH AT 8000 FT DECLARED AN EMER DUE TO SLAT EXTENSION FAILURE; AND RECEIVED TRAILING EDGE FLAPS WITH SLATS FAIL MESSAGE. AOM PROCS PERFORMED AND TRAILING EDGE FLAPS RECOVERED. LANDED UNEVENTFULLY.

Narrative

WE WERE BEING VECTORED FOR RWY 27L INTO ZZZ. AT 8000 FT AND 210 KTS; THE FO REQUESTED FLAPS 1 AND 8. AT THAT TIME WE GOT A SLATS FAIL CAUTION MESSAGE. THE FLAPS WOULD NOT DEPLOY AS WELL. I ASKED FOR VECTORS SO THAT WE COULD PERFORM THE AOM PROCS. AFTER WE COMPLETED THE PROCS OUTLINED IN THE AOM; WE WERE ABLE TO GET THE FLAPS TO WORK; BUT NOT THE LEADING EDGE SLATS. I BRIEFED THE FLT ATTENDANTS AND PAX; CALLED MAINT; DECLARED AN EMER AND LANDED SAFELY. THE PAX WERE CALM WHEN THEY EXITED THE ACFT. I'M NOT SURE WHY WE GOT THE SLATS FAIL MESSAGE. THERE ARE WAY TOO MANY MELS IN THE CRJ. IT SEEMS TO ME THAT MOST OF THE MELS AND PROBLEMS IN THE CRJ ARE NOT FIXED; THEY END UP OPS CHKING GOOD.CALLBACK CONVERSATION WITH RPTR REVEALED THE FOLLOWING INFO: THE RPTR STATED AFTER BEING VECTORED TO PERFORM THE OPERATING MANUAL PROCS FOR SLAT AND FLAP FAILURE; THE TRAILING EDGE FLAPS BEGAN OPERATING; BUT THE LEADING EDGE SLATS REMAINED FAILED. THE LNDG WAS UNEVENTFUL. THE RPTR INDICATED THAT MAINT DID NOT REMOVE THIS AIRPLANE FROM SVC; BUT RERACKED THE FLAP SLAT CTL UNIT AND RETURNED THE AIRPLANE TO SVC WHERE IT FAILED TWO MORE TIMES WITH THE SAME RPT.

More incidents for this aircraft family →

Source: NASA Aviation Safety Reporting System (public domain). Reports are voluntary submissions and are not verified by NASA.