A B757-200 HAD AN ENG ICE IMPACT PANEL REPLACED. JOB REQUIRED REMOVAL AND INSTALLATION OF FAN BLADES FOR ACCESS TO PANEL. NO REQUIRED INSPECTION OF FAN BLADES WAS ACCOMPLISHED.
Synopsis
A B757-200 HAD AN ENG ICE IMPACT PANEL REPLACED. JOB REQUIRED REMOVAL AND INSTALLATION OF FAN BLADES FOR ACCESS TO PANEL. NO REQUIRED INSPECTION OF FAN BLADES WAS ACCOMPLISHED.
Narrative
AS WKEND DUTY SUPVR; I WAS NOTIFIED BY MAINT OPS TO SEND A FIELD TRIP TO ZZZ TO REPLACE AN ICE IMPACT PANEL. THE MAINT OPS SAID ZZZ MECHS WOULD REMOVE AND REPLACE THE FAN BLADES; ZZZ2 FIELD TRIP MECHS WOULD REPAIR ICE IMPACT PANELS ONLY. I DISPATCHED A MECH FROM THE FIELD TRIP LIST ON MAY/XA/06. ON MAY/XB/06 AT XA00 HE CALLED AND TOLD ME HE WAS TOO TIRED TO WORK AND NEEDED TO GO HOME. I CALLED 2 MORE MECHS; INFORMED THEM OF THE JOB AT HAND AND GAVE THEM THE CELL PHONE NUMBER OF THE MECH CURRENTLY ON THE JOB SO A JOB STATUS COULD BE GIVEN. I CALLED THE MECH WHO WANTED TO GO HOME AND INFORMED HIM RELIEF MECHS ARE ON THE WAY. HE SAID OK AND THAT HE WOULD UPDATE THEM ON THE FIELD TRIP REQUEST. CONTRIBUTING FACTORS: EMPLOYEE DID NOT UNDERSTAND THAT ZZZ MECHS WOULD REMOVE AND REPLACE THE FAN BLADES. SUPPLEMENTAL INFO FROM ACN 698495: A NUMBER OF SHIFT CHANGES OCCURRED DURING THAT TIME. I DON'T EVEN RECALL SEEING OR MEETING THE INDIVIDUAL OR INDIVIDUALS WHO ACTUALLY PERFORMED THE REPAIR; LET ALONE OBSERVING HIM REMOVING BLADES OR HAVING ANY KNOWLEDGE OF ALLEGED BLADE OR BLADES REMOVAL AND REINSTALLATION. I WISH TO REITERATE THAT TO THE BEST OF MY KNOWLEDGE THE SERIAL NUMBER XXXXX CONSTITUTED ALL OF THE NON-ROUTINE MAINT PERFORMED TO FACILITATE THE REPAIR IN QUESTION.
More incidents for this aircraft family →
Source: NASA Aviation Safety Reporting System (public domain). Reports are voluntary submissions and are not verified by NASA.