CRJ 200 ENG OIL TEMP EXCEEDED OPERATING LIMITS ON #1 ENG. FLT CREW PERFORMED THE PROCEDURE FOR THE MALFUNCTION; SHUT DOWN THE ENG AND RETURNED TO DEP ARPT.
Synopsis
CRJ 200 ENG OIL TEMP EXCEEDED OPERATING LIMITS ON #1 ENG. FLT CREW PERFORMED THE PROCEDURE FOR THE MALFUNCTION; SHUT DOWN THE ENG AND RETURNED TO DEP ARPT.
Narrative
ON CLBOUT WE NOTICED THAT THE #1 ENG OIL TEMP WENT INTO THE RED AT 163 DEGS. ALL OTHER ENG INDICATIONS WERE NORMAL AND THERE WERE NO WARNING MESSAGES. I REDUCED THE THRUST ON THE ENG TO SEE IF IT WOULD RESPOND OR DECREASE THE OIL TEMP; BUT IT DID NOT. AS A PRECAUTIONARY MEASURE; WE THEN CALLED MAINT CTL TO DOUBLE-CHK WITH THEM PRIOR TO US SHUTTING DOWN THE ENG AS THE QRH WAS DIRECTING. MAINT AGREED AND SAID TO CALL THEM ON THE GND. I WAS THE PF AND TOOK OVER THE RADIOS SO THAT THE FO COULD CARRY OUT THE QRH PROC. WE THEN PROCEEDED TO PERFORM THE QRH PROC FOR HIGH OIL TEMP; WHICH LED US TO SHUT DOWN THE #1 ENG. I INFORMED CTR THAT WE HAD SHUT DOWN THE #1 ENG AS A PRECAUTION AND THAT I WANTED HDG VECTORS TO STAY IN THE ZZZ AREA (AS THAT WAS THE NEAREST SUITABLE) AND WE WOULD MOST LIKELY BE DIVERTING THERE. WE SPOKE WITH THE FLT ATTENDANT SO THAT SHE COULD START PLANNING AND CONTINUED WITH OUR PROCS. THE FO DID A GREAT JOB IN PERFORMING THE CHKLISTS; SPEAKING WITH DISPATCH TO COORDINATE OUR INTENTIONS AND THEN MADE AN ANNOUNCEMENT TO THE PAX. ONCE WE WERE READY; WE GOT VECTORED FOR THE APCH TO ZZZ AND HAD A SMOOTH APCH AND LNDG. I HAD DECLARED AN EMER AND REQUESTED CFR TO BE STANDING BY JUST IN CASE. WE TAXIED THE PLANE TO THE GATE AND GOT THE PAX INTO THE TERMINAL WHILE WAITING FOR MAINT TO ARRIVE. WE DID PERFORM AN OVERWT LNDG BUT HAD A SOFT TOUCHDOWN WITH ABOUT 0-50 FPM RATE OF DSCNT. I MADE A SEPARATE WRITE-UP IN THE MAINT LOGBOOK PERTAINING TO THAT. I BELIEVE THAT WE DID WELL AS A CREW IN OUR DECISION-MAKING AND USE OF CRM. THE ONLY CRITICISM I HAVE TO RPT IS THE DIFFICULTY WE HAD IN ESTABLISHING AND MAINTAINING COMS WITH DISPATCH ON THE LCL RADIO FREQ OR XXX RADIO. THE CONNECTION KEPT GETTING BROKEN AND IT COST US SOME TIME IN GETTING THE PLANE ON THE GND IN ZZZ. IF THERE WERE A WAY TO IMPROVE THAT SYS; IT WOULD REALLY HELP TO EASE THE WORKLOAD DURING A SITUATION SUCH AS THIS.
More incidents for this aircraft family →
Source: NASA Aviation Safety Reporting System (public domain). Reports are voluntary submissions and are not verified by NASA.