No fatalities

10 Jul 2020: Air Tractor AT502 B (N61315) — Bailey Flying Service Inc. — Dalhart, TX

Dalhart, TX, United States

On 10 Jul 2020, an Air Tractor AT502 B (registration N61315) operated by Bailey Flying Service Inc. was involved in an aviation accident near Dalhart, TX. No fatalities were reported. Investigators recorded the probable cause as: The total loss of engine power due to a failed fuel control unit bearing. This summary draws on records from NTSB; 12 related events involving the same aircraft type or operator are linked below.

SourcesNTSBPrimary reportUpdated 1778583330Data APIEditorial standards

On July 10, 2020, an Air Tractor AT-502B (N61315) experienced engine power loss during return from aerial application, leading to a forced landing in a pasture. The pilot was uninjured, but both wings sustained substantial damage.

Accident Overview

On July 10, 2020, at approximately 1455 central daylight time, an Air Tractor AT-502B airplane, registration N61315, sustained substantial damage during a forced landing near Dalhart, Texas. The pilot, the sole occupant, was not injured. The flight was conducted under Title 14 Code of Federal Regulations Part 137 as an aerial application operation.

Sequence of Events

The operator reported that the pilot was returning to the airport after completing an aerial application when the engine lost power. The pilot executed a forced landing to a pasture. During the landing, both wings sustained substantial damage.

Engine Examination

An examination of the engine revealed that the fuel control unit (FCU) input drive shaft would not rotate. Further examination established that the FCU input drive spool bearing had failed. However, the cause of the bearing failure could not be determined.

Maintenance History

The FCU was overhauled in July 2016. The overhaul facility reported that the spool bearing was replaced at that time. The airplane maintenance records did not include a notation as to when the FCU was installed on the engine. Consequently, the exact time in service was not determined. The engine had accumulated about 594 hours since December 2016. The FCU manufacturer recommended an inspection every 3,000 hours and an overhaul every 6,000 hours time-in-service. Both the spool and drive bearings are required to be replaced at those intervals.

Contributing factors

Fuel control/carburetor — FailureContributed to outcome