We’re still collecting data for this aircraft. Routes appear once we’ve seen it fly enough times.
Attempted Operation W/Known Deficiencies In Equipment; Continued Vfr Flight Into Adverse Weather Conditions; Exceeded Designed Stress Limits Of Aircraft; Spars; Overload Failure. Factors: Separation In Flight; Icing Conditions-Includes Sleet,Freezing Rain,Etc.; Airframe Ice
Lockheed 18 · 11 fatalities