A DC10-10 WAS DISPATCHED IN NON COMPLIANCE WITH #2 ENG VARIABLE STATOR VANE FIRST STAGE ASSEMBLED INCORRECTLY DURING ENG BUILDUP.

1999-12 · NASA ASRS report 459121

Date: 1999-12 · Aircraft: DC-10 10 · Phase: ground

Anomalies: aircraft-equipment-problem-critical|deviation-discrepancy-procedural-maintenance|deviation-discrepancy-procedural-published-material-policy

Synopsis

A DC10-10 WAS DISPATCHED IN NON COMPLIANCE WITH #2 ENG VARIABLE STATOR VANE FIRST STAGE ASSEMBLED INCORRECTLY DURING ENG BUILDUP.

Narrative

AT XA52 ON DEC/XA/99; I RECEIVED A LETTER OF INVESTIGATION FROM THE FAA. THE LETTER STATED A REVIEW OF ENG RECORDS OF ENG SERIAL NUMBER WVXY REVEALED SOME PARTS WERE IMPROPERLY INSTALLED. AS PER CARD # 6-7 OF THE CORE ENG MODULE FRONT STATOR CASE ASSEMBLY LOG; ON JUL/MON/98 I VERIFIED THE MATCHING STATOR CASE SERIAL NUMBERS; INSTALLED THE INLET GUIDE VANES AND FIRST STAGE VARIABLE STATOR VANES IN BOTH THE UPPER AND LOWER CASE HALVES ON DEC/TUE/98. ON THIS DATE I ALSO INSTALLED THE ACTUATION RING SEGMENTS FOR BOTH IGU AND STAGE 1 VANES. DURING THIS INSTALLATION OF THE RINGS; THE LEVER ARMS FOR THE PARTICULAR VANE STAGE IS ALSO INSTALLED. IT WAS SHOWN TO ME BY MR X (CF6-6 STATOR CASE ENGINEER) THAT AN IGU LEVER ARM AND SECOND STAGE LEVER ARM WERE INSTALLED IMPROPERLY ON THE FIRST STAGE ACTUATION RING. I CAN STATE WITH FULL HONESTY THAT AT THE TIME OF INSTALLATION OF THE LEVER ARMS ON THE STAGE 1 OF THIS STATOR CASE'S ACTUATION RINGS; INSTALLED THE PARTS BELIEVING THEM TO BE THE CORRECT PARTS AND INSTALLED THEM ACCORDING TO THE PROCS STATED IN THE BILL OF WORK AND JOB CARD (CF6-6 ENG BUILD MANUAL) AND THE SHOP PROCS IN PLACE AT THAT TIME TO THE BEST OF MY ABILITY. CALLBACK CONVERSATION WITH RPTR REVEALED THE FOLLOWING INFO: THE RPTR STATED 2 INCORRECT VARIABLE STATOR VANE LEVER ARMS WERE INSTALLED IN THE FIRST STAGE COMPRESSOR SECTION INADVERTENTLY. THE RPTR SAID WHEN THIS ENG WAS BUILT UP THE MANUAL HAD NO POSITIVE WAY OF IDENTING THE VARIOUS LEVER ARMS AND THE STAGE MATCH. THE RPTR STATED THIS INCIDENT RESULTED IN A FIXTURE BEING BUILT THAT CHKED THE LEVER ARM AND IDENTED THE STAGE IT MATCHED. THE RPTR SAID THE PROC NOW IS TO IDENT THE ARM AND THEN ETCH THE LEVER ARM WITH THE MATCHING STAGE EITHER '0;' '1;' OR '2.' THE RPTR SAID THE IMPROVED PROC WAS LONG OVERDUE AND WILL PREVENT THIS TYPE OF INCIDENT FROM HAPPENING AGAIN. THE RPTR STATED THE FAA HAS CONTACTED THE RPTR REGARDING THIS INCIDENT. CALLBACK CONVERSATION WITH RPTR ACN 459122 REVEALED THE FOLLOWING INFO: THE RPTR STATED THE LEVER ARMS WERE INSTALLED PRIOR TO HIS INVOLVEMENT WITH THE ENG COMPRESSOR CASE. THE RPTR STATED THE ENG BUILD UP MANUAL HAS BEEN REVISED TO USE A FIXTURE TO MEASURE AND IDENT THE ARMS. THE RPTR SAID THE ENG IN QUESTION OPERATED FOR 1500 HRS WHEN REMOVED FOR STALLING. THE RPTR STATED OTHER ENG PROBS AND NOT THE 2 INCORRECT LEVER ARMS MAY HAVE BEEN THE CAUSE OF ENG REPLACEMENT.

Source: NASA Aviation Safety Reporting System (public domain). Reports are voluntary submissions and are not verified by NASA.

Loading the flight search…

Frequently asked questions

How do I search flights by aircraft type on FlightFinder?

Pick an aircraft model — Boeing 737, Airbus A320, A380, Boeing 787 Dreamliner and more — enter your origin airport, and FlightFinder shows every route that plane flies from there with live fares.

Which aircraft types can I filter by?

We support Boeing 737/747/757/767/777/787, the full Airbus A220/A319/A320/A321/A330/A340/A350/A380 family, Embraer E170/E175/E190/E195, Bombardier CRJ and Dash 8, and the ATR 42/72 turboprops.

Is FlightFinder free to use?

Search and schedules are free. Pro ($4.99/month, $39/year, or $99 one-time lifetime) unlocks the enriched flight card — on-time stats, CO₂ per passenger, amenities, live gate & weather — plus My Trips with push alerts.

Where does the route data come from?

Live schedules come from Amadeus, AeroDataBox and Travelpayouts. Observed routes (which aircraft actually flew a given city pair) are crowdsourced from adsb.lol ADS-B data under the Open Database License.