Casualties unknown

2025-02-02: A320-AIRBUS (G-UZHA) — Hurghada Airport , Egypt, EG

Hurghada Airport , Egypt, EG

On February 2, 2025, an A320-AIRBUS (registration G-UZHA) was involved in an aviation accident near Hurghada Airport , Egypt, EG. This summary draws on records from the Egyptian Aircraft Accident Investigation Directorate (EAAID).

Sourcesthe Egyptian Aircraft Accident Investigation Directorate (EAAID)Primary reportUpdated 1781150177Data APIEditorial standards
Aircraft registered G-UZHA
Aircraft registered G-UZHA. Photo: Markus Eigenheer from Genève, Schweiz / CC BY-SA 2.0, via Wikimedia Commons

An easyJet Airbus A320-251N descended to 882 feet radio altitude during approach, triggering GPWS alerts. The captain conducted an immediate manual climb maneuver, averting a CFIT situation. No injuries or damage.

History of the Flight

On 2 February 2025, an Airbus A320-251N, registration G-UZHA, operated by easyJet, was conducting a scheduled commercial flight from Manchester International Airport, United Kingdom, to Hurghada International Airport (HEGN), Egypt. During the approach phase, while descending over a mountainous area, the aircraft descended to a minimum of 882 feet radio altitude at an indicated airspeed of 247 knots. The captain disconnected the autopilot and initiated an immediate manual turning climb maneuver to avoid terrain. Five seconds later, multiple Ground Proximity Warning System (GPWS) alerts were triggered, including “Terrain, Terrain” and “Pull Up.” This led to a Controlled Flight into Terrain (CFIT) situation. The flight subsequently continued and landed on Runway 34L at Hurghada International Airport. There were no injuries to persons on board and no damage to the aircraft.

Investigation

The Egyptian Aircraft Accident Investigation Directorate is conducting the investigation, classified as a serious incident. A draft final report has been shared with participating states and organizations. No recommendations have been issued to date. The next steps include completion of the final report, subject to receipt and consideration of comments from participating states and organizations, and final coordination and discussion of those comments.