166 Pneumatic (ATA 36) service difficulty reports for the Embraer E190/E195 — 2.2% of all reported difficulties.
Most reported components
- VALVE 22
- SHUTOFF VALVE 20
- PRECOOLER 15
- BLEED AIR SYS 9
- SEAL 7
- WARNING SYSTEM 7
- LOOP 6
- CONTROLLER 6
- DUCT 5
- CONNECTOR 5
- BLEED VALVE 5
- LINE 4
- CLAMP 4
- REGULATOR VALVE 4
- SENSOR 3
Report counts reflect fleet size and reporting activity, not relative safety or reliability. Source: FAA Service Difficulty Reporting System (public domain).